A3 Hindhead

A3 Hindhead – In Between 2008 and 2012 Lochwynd successfully completed the A3 Hindhead Tunnel project consisting of:

  • • Communications Infrastructure Installation & Commissioning
  • • Street Lighting Installation
  • • Hardwired Road Stud Installations for Tunnel Lane Control
  • • Barrier Wig-Wag Installation
  • • Tunnel Lane Control Signage
  • • ERT Installation
  • • CCTV Infrastructure
  • • Average Speed Camera Installation